Job aid · Free · Print it and take it to the store
Variance investigation checklist
A miss is a starting point, not a cause. Work down this page before you coach, brief or change a price.
1. Size it
- State the miss in percentage points (31% to 35% is +4 points, not +4%).
- Convert it to dollars: points × sales. That is the number your boss will ask for.
- Say whether it is a rate problem, a volume problem, or both.
2. Food cost: check each driver before assigning a cause
- Price. Did what we pay per unit change? Compare invoices with the last period and the contract.
- Usage. Actual versus theoretical usage on the top 5 cost items. Is the gap in portioning, prep yield or recipe?
- Waste. Is recorded waste up, and is it where the usage gap is? Is anything being wasted but not logged?
- Mix. Did the share of higher-cost items rise? Check mix before blaming the kitchen.
- Inventory. Was the count accurate? Recount the 3 to 5 highest-dollar items before you trust the number.
- Shrink. Repeated adjustments with no matching waste entry are a signal to verify, not a conclusion.
3. Labor: separate the effects
- Sales. Did sales move? Labor percentage rises when sales fall even if hours do not change.
- Hours. Scheduled versus actual hours by daypart. Where are hours not following volume?
- Rate. Wage rate and overtime: separate them from hours before you cut anything.
- Productivity. Sales per labor hour by daypart. Where is it lowest?
4. Coach and brief
- Coaching: name the facts, the owner, the change you expect, and the date you will check.
- Briefing your boss: the number, the dollars, what you know, what you are still checking, the next update date.
- Never present a signal (a count adjustment, a pattern) as a verified cause.
5. Plan: three actions at most
Each one needs an owner, a check date, the expected point move, and how you will verify it worked.
Practice using this on a realistic P&L: try the free food-cost challenge.